$18,759.00
- Payments as low as $429/mo! Click here for more information on financing!
- Interested in learning more about how our custom build process works at 3R? Check out our 3R Custom Build Process here!
**Lead times may vary – standard production of a custom install takes two weeks. Please call our office for the most accurate production time 330-753-8394.
Description
**This equipment was installed in a 2023 Chevy Express Ended Cargo Van. Vehicles are to be supplied by the customer – 3R does not offer the option to purchase vans and/or box trucks through us. If you’re looking for a custom install in a different style or model vehicle, please reach out to us via our contact form or through email and we’d be happy to get you an accurate quote for your available vehicle!
Pressure Washer:
- 3000 PSI, 4.8 GPM
- 16hp (479cc) Vanguard Engine, Twin Cylinder – Electric Key Start
- Belt Drive AR Triplex Plunger Pump
- EZ Align Belt Tensioning System: allows for easy, single bolt, belt tensioning adjustments.
- Stainless Steel Frame, Coil Wrap & Panels: rugged & durable stainless steel offers corrosion resistance and protection of your valuable investment from the harshest environments. Keeps you machine looking like new for years to come.
- 12v Diesel Burner System
- 388,000 BTU
- Spiralast Coil: manufactured by Hydro Tek – Robotically fused 1/2″ schedule 80 steel pipe is cold rolled to protect the steel pipe from fatigue. The coil is then surrounded by ceramic insulation and stainless enclosure with double-wall end caps. Lifetime Coil Warranty.
- 8 Gallon Gas and Diesel Tanks: Heavy duty “roto-molded” rust free fuel tanks with fuel filter to protect against contaminated fuel. Safely refuel tanks away from hot engine. Extended run time with larger fuel capacity.
- Adjustable Thermostat
- Burst Disc Technology for Operator Safety
- 250 Degree Steam Setting
- 36″ Wand with Trigger Gun & QC’s
Install Package:
- 200 Gallon Water Tank
- Tank Overflow Valve – 3/4″ water fill – stop water flow when tank is full and will continue to fill when water level drops
- Tank Drain – 3/4″ drain hose with ball valve that drains to passenger side or rear of truck
- Heavy Duty Water Tank Filter – to help keep debris out of your equipment
- Heavy Duty Hold-Down Bands
- (1) 4′ Aluminum Base
- Titan 12″ Aluminum High Pressure Hose Reel (Pressure Washer)
- 1/2″ Stainless Steel Manifold
- Holds max of 300′ of 3/8″ hose
- 200′ High Pressure Hose, Gray, 1WB, 4000 PSI
- Includes Locking Pin
- Titan 12″ Aluminum High Inlet Hose Reel
- 1/2″ Stainless Steel Manifold
- Holds max of 100′ of 3/4″ hose
- 100′ x 3/4″ Flexzilla Inlet Hose
- Includes Locking Pin
- Installation – installation of above components into pictured van, including labor, additional plumbing, hardware, & fittings
- Training – Operations, winterization, and safety & maintenance training provided at pick up. Typically takes 30-90 minutes depending on the complexity of your build
Add On / Upgrade Options:
- Upgrade to Hydro Tek SS35006HG Model Pressure Washer – 3500 PSI, 5.5 GPM
- Upgrade to Hydro Tek SS35008HG Model Pressure Washer – 3500 PSI, 7.8 GPM *THIS OPTION IS PICTURED IN THE LISTING PHOTOS
- NOTICE: Owner should, at minimum, have a headache rack installed behind the driver and passenger seats to prevent any objects from reaching passengers in the event of, but not limited to, a hard brake, or accident. Full closure between the vehicle cabin area and cargo area is preferred. This is the sole responsibility of the vehicle owner, not 3R Sales & Service.
- If you plan to finance a trailer unit or machinery, final transactions for those items must take place with a 3R associate, pending approval of your application. All website transactions must be paid in full at checkout. If you have any questions about the financing process or timelines, please call us at 330-753-8394 or at 800-824-8252. Thank you!









